• MCS-approved products
  • Tracked delivery
  • Next Day Delivery

SolarEdge

SolarEdge Power Management and Climate Sensor Package <250A AC Supply

SKU SE-PM-S-3PH-250 OUT OF STOCK
£949.72 Exc. VAT
Tracked Delivery Order before 2pm for next-day delivery
Quantity
Total
£949.72
14-Day Returns Secure Checkout
Why Choose ClearRay Solar?
  • UK stock — no drop-ship delays
  • MCS-certified products
  • Industry-lowest trade rates
Need Help Choosing?
  • Free system design support
  • Match inverters to panels with our online tool
  • G98 / G99 compliance flagging
  • Real-time stock availability
Open System builder →
Trade-Ready Supply
  • Next-day delivery on stocked items
  • Pallet quantities available — request a quote
  • Dedicated account support
SolarEdge Power Management and Climate Sensor Package <250A AC Supply
Part No: SE-PM-S-3PH-250
Power Management - Export Limitation 3ph
This part is made up of the following items:
1 x SE1000-CCG-G-S1 SolarEdge Commercial Gateway
1 x SE1000-SEN-IRR-S1 Irradiance sensor 0-1.4V
1 x SE1000-SEN-TMOD-S2 Module temperature sensor 4-20mA inc PSU
1 x SE-WND-3Y400-MB-K2 1PH/3PH 230/400V SolarEdge Energy Meter K2 with Modbus Connection
3 x SE-CT-SPL-250A-A 250A Split-Core Current Transformer for SolarEdge Energy Meters with Modbus Connection
1 x SE1000-RS485-IF01 SolarEdge RS485 Plug-in
20 x RS485-DOUBLE-1M Double pair genuine RS485 cable 1M - 4 coresPrice per Meter

This kit is a full monitoring package for Solaredge commercial systems that allows full recording and display of energy generation, usage and environmental conditions. Ensures that the complete system is performing at its maximum potential and enables optimisation of energy consumption.

A 20m length of RS-485 cable is included for connection between the first inverter and energy meter, and for connecting the inverters in the bus. Please check if this quantity is sufficient.

Note: This kit includes 1x RS485 Expansion Kit, which means its only suitable for systems with 2x inverters. If more than 2x inverters on site additional RS485 Kit per inverter will be required, if only one inverter on site this part will not be required.

Supplied with 3 X 250A current monitoring clamps suitable for installation on properties with up to 250A per phase power suppiy.

Current clamps should be sized according to incoming grid supply in the property, please check if these are sufficient before buying. Please note smaller CTs are available.

Delivery times vary by region:

  • UK — 1-2 business days
  • Highlands & Islands — 1-2 business days

Returns accepted within 14 days of delivery for unused items in original packaging.