
90kW Synergy Manager SWITCH DC Switch, MC4, DC SPD
£3,263.10
Exc. VAT
Tracked Delivery
Order before 2pm for next-day delivery
90,000 W
Power Output
98 %
Max Efficiency
0 V
Battery Voltage
0.0
MPPT Inputs
1,000 V
Max Input Voltage
135,000 W
Max DC Power
90,000 W
Max AC Power (5m)
90,000 W
Surge AC (1s)
130.5 A
Max DC Current
12.0
Max DC Inputs
Yes
Integrated DC Switch
0 V
Min MPPT Voltage
0 V
Max MPPT Voltage
14-Day Returns
Secure Checkout
Why Choose ClearRay Solar?
- UK stock — no drop-ship delays
- MCS-certified products
- Industry-lowest trade rates
Need Help Choosing?
- Free system design support
- Match inverters to panels with our online tool
- G98 / G99 compliance flagging
- Real-time stock availability
Trade-Ready Supply
- Next-day delivery on stocked items
- Pallet quantities available — request a quote
- Dedicated account support
- 90kW Synergy Manager SWITCH DC Switch, MC4, DC SPD
- Part No: SE-90000-SWITCH-FULL
- Inverters - Main Units
- Rating: 90,000W
- Pre-commissioning feature for automated validation of system components and wiring during the site installation process and prior to grid connection.
- Easy 2-person installation with lightweight, modular design (each inverter consists of 2 or 3 Synergy Units and one Synergy Manager).
- Independent operation of each Synergy Unit enables higher uptime and easy serviceability.
- Built-in thermal sensors detect faulty wiring ensuring enhanced protection and safety.
- Built-in arc fault protection and optional rapid shutdown (depending on Synergy Manager used)
- Built-in PID mitigation for maximized system performance.
- Monitored and field-replaceable surge protection devices: integrated RS485 and Type 2 DC SPDs, optional Type 2 AC SPD.
- Integrated DC safety switch eliminates the need for external DC isolators.
This part is made up of the following items:
| 3 x SE-SYNERGY-RSD | Synergy Secondary Unit with RapidShutdownDevice | |
| 1 x SE-90000-MNGR-S | 90kW Synergy Manager SWITCH with DC Switch, MC4, DC SPD | |
Three Phase Synergy Inverter
Main features:
Please note FULL parts consist of 1x Synergy Manager and 2x Synergy Units ( 3x for 90 and 100kW)
Some documents are currently missing. These will be added as soon as available.
Delivery times vary by region:
- UK — 1-2 business days
- Highlands & Islands — 1-2 business days
Returns accepted within 14 days of delivery for unused items in original packaging.

