Tesla Neurio W2 meter kit with 3 x 200A CTs and RS 485 Meter cable
This Tesla Neurio W2 meter kit comes with three 200 A CT clamps, one for each phase, plus the RS-485 meter cable that wires it to the charger. It is the three-phase form of the metering behind Tesla’s Dynamic Power Management: the meter watches L1, L2 and L3 where they enter the board, and a Gen 3 Wall Connector trims its charging current whenever the property’s own load leaves less headroom.
The kit in numbers
What's in the box
- Neurio W2 meter kit
- 3 × 200 A current transformers
- RS-485 meter cable for the wired link to the Wall Connector
- The Wall Connector itself
- Wago 3-, 4- and 5-way lever nuts, which Tesla specifies for the harness splices
- 1.5 mm² shielded twisted pair to reach from the board to the charger
Why three clamps
Tesla publishes its Neurio energy meter kit for Dynamic Power Management in two versions: 1938241-01-A with one CT and 1938241-02-A with three. A single clamp covers a single-phase board, and that version is our Wall Connector Dynamic Power Management Kit. On a three-phase supply every line conductor carries its own load, so each needs a clamp before the meter can see the true headroom. That matters because a three-phase Wall Connector on a 40 A breaker delivers 22.1 kW at 400 V, while dropping to a 20 A breaker caps it at 11 kW for good. Managing the load lets the charger keep the larger setting and back off only when the house is busy.
Three-phase wiring, phase by phase
Tesla requires the board to be dead before any of this starts. The meter needs 203 × 203 × 102 mm of room inside the enclosure, and its voltage leads land on a dedicated breaker of no more than 20 A: brown to L1, black to L2, grey to L3 and blue to the neutral bar. The three clamps then close round the incoming L1, L2 and L3 conductors with “Source this Side” facing the grid. Port order is not optional here. The L1 clamp may use port 1 or port 4, but L2 must go in port 2 and L3 in port 3, because each port takes its voltage reference from a fixed phase. Tesla also says to plug each CT into the meter before clamping it round a conductor.
At the charger end, the RS-485 cable is extended with shielded twisted pair, its red lead going to the red terminal and its black lead to the white one. Tesla warns that this polarity cannot be swapped once installed.
Commissioning
With solar switched off so every reading should be positive, the Wall Connector is commissioned in Tesla One on firmware 25.42.1 or newer, and the meter appears by itself. All three CTs are given the Conductor location, then the Max Conductor Limit is entered at 80% of the board’s rated limit. A quick proof is to set the limit low for a moment, switch on heavy loads and watch the charge rate fall.
Works with
-
Tesla Gen 3 Wall Connector - 7kW/22kW Type 2 Tethered
The charger this meter regulates. Its 22 kW three-phase rating is the output the three clamps help protect.
-
Tesla Wall connector Dynamic Power Management Kit
The one-clamp version, sized for a single-phase board rather than three phases.
-
Tesla CT Kit, 2 x 200A for Neurio W2
Two spare W2 clamps, for replacing a damaged one without buying another meter.
Please Note: Powerwall 3 is not compatible with Neurio meter equipment
Three-phase meter questions
No. Tesla supports Dynamic Power Management on 400 V three-phase wye with a neutral, not on delta (usually 230 V line to line) or open wye connections.
Tesla lists the feature for sites with a single Wall Connector installed. Other layouts are not supported.
No. Tesla states Neurio CTs are not compatible with its Remote Meter, and each CT works only with the meter it was designed for. A Powerwall 3 is metered with the Tesla Remote Energy Meter Kit instead.
Tesla’s metering guide lists a premade 3.3 m extension for W2 clamps, part 1622289-00-x.
Tesla says the energy meter for this feature has to come from Tesla, because it ships with the firmware Dynamic Power Management relies on.
Most orders are delivered the next working day, subject to the delivery method, product availability, order processing time and destination. Next-working-day delivery is typical for standard deliveries and is not guaranteed for every order.
Pallet deliveries may take an additional day or so, depending on the products ordered, the delivery location and the carrier’s schedule. Special delivery arrangements may also require additional time.
Please refer to your tracking information for the latest delivery updates.






