• MCS-certified products
  • Next Day Delivery
SolarEdge OUT OF STOCK

66.6kW Synergy Manager SWITCH with DC Switch, MC4, DC SPD

SE-66600-MNGR-S
£1,040.26 ex VAT £1,248.31 inc VAT

How many inverters do you need?

Secure Checkout 14-Day Returns Tracked Delivery
High Conversion EfficiencyMore of your solar reaches the home
MPPT TrackingMaximises yield in changing light
Grid CompliantMeets UK G98 / G99 requirements
Technical Specifications
Rated Power (Pmax)66,600 W
Max DC Power116,550 W
Warranty12 years standard, extendable to 20 years
View Full Datasheet

SolarEdge 66.6kW Synergy Manager SWITCH with DC Switch, MC4, DC SPD

SolarEdge · Three Phase with Synergy Technology

66.6kW Synergy Manager SWITCH with DC Switch, MC4, DC SPD

SolarEdge Three Phase with Synergy Technology — 50 kW to 100 kW that two people can carry up a ladder, one Synergy Unit at a time.

A 100 kW inverter is normally a crane job. Synergy Technology takes it apart: one Synergy Manager plus two or three Synergy Units, each light enough for two people, assembled on the wall. On a retrofit roof with no plant room, no lift and no crane access, that is often the only workable answer.

Rated output
66,600 WThree phase AC output
Maximum PV input
116,550 W total / 58,275 W per Synergy UnitArray size this inverter accepts
Warranty
12 yearsStandard, extendable to 20 years
Important

Please read before ordering

Warning: Solar Edge Synergy Manager can not be used on its own, it always requires Synergy Units to work, 2x for 50kW and 66.6kW and 3x for 90kW and 100kW.
Overview

About the SolarEdge Three Phase with Synergy Technology

Splitting the inverter also splits the risk. Each Synergy Unit operates independently, so a fault takes out a third of the capacity rather than all of it, and a failed unit is swapped without dismounting the whole inverter. On an asset with a performance obligation attached, that uptime difference matters more than a tenth of a percent of efficiency.

The pre-commissioning feature validates wiring and system configuration during installation, before grid connection — catching the wiring errors that otherwise surface on commissioning day with the DNO waiting. Thermal sensors watch for faulty terminations, built-in PID mitigation protects long-term yield, and the surge protection devices are monitored and field replaceable.

For the installer

String design, certification and what is in the box

The details that decide whether this unit suits the job:

  • Modular: one Synergy Manager plus two or three Synergy Units. Each piece is a two-person lift.
  • Inverter power rating is set at commissioning, so one part number covers several ratings.
  • Pre-commissioning validates wiring and configuration before grid connection.
  • SafeDC as standard with optional rapid shutdown; arc fault protection built in.
  • Built-in PID mitigation; monitored, field-replaceable DC and AC surge protection.
  • Optional integrated DC safety switch removes external DC isolators.
  • 1,000 Vdc maximum, 680 – 1,000 Vdc operating window.
Applications

Where this inverter earns its place

The Three Phase with Synergy Technology is specified most often for these jobs.

Large industrial rooftops50 kW to 100 kW per inverter.
Retrofit sites with no crane accessThe single strongest reason to choose Synergy over a monolithic inverter.
Ground mount and solar farmsIndependent Synergy Units keep partial capacity online through a fault.
Assets under PPA or performance guaranteeModular failure and field-replaceable parts protect availability.
Multi-megawatt phased buildsConsistent platform across phases, one monitoring portal.
Battery and storage

Can I add a battery to this?

This is a grid-tied PV inverter. It converts solar DC into AC for the property and the grid, and it has no battery port. That is not a shortcoming — it is the right architecture for a system without storage, and it is why it costs what it does.

If storage is on the roadmap, you have two routes. Add an AC-coupled battery system alongside this inverter later, which works with any PV inverter and needs no change to what is already installed. Or choose a hybrid inverter now and pay for a battery port you will use in a year or two. We are happy to talk that trade-off through before you order.

Technical specification

SolarEdge SE66.6K technical data

This model
Recommended maximum PV power116,550 W total / 58,275 W per Synergy Unit
Output and performance
Rated output power66,600 W
Maximum active output power66,600 VA
Maximum output current96.5 A
Synergy Units required2 Synergy Units
Common to the range
AC output voltage — line to line / line to neutral (nominal)380 / 220; 400 / 230 Vac
AC output voltage range304 – 437 / 176 – 253; 320 – 460 / 184 – 264.5 Vac
AC frequency50 / 60 ±5 %
AC output line connections3W + PE, 4W + PE
Supported gridsWYE: TN-C, TN-S, TN-C-S, TT, IT; Delta: IT
Total harmonic distortion≤3 %
Power factor range±0.2 to 1
Transformer-less, ungroundedYes
Maximum input voltage DC+ to DC−1,000 Vdc
Operating voltage range680 – 1,000 Vdc
SafeDCYes, with optional rapid shutdown
Arc fault protectionYes
PID mitigationBuilt in
Surge protectionMonitored and field replaceable, DC and AC
DC safety switchOptional, integrated
CommunicationEthernet or cellular, with built-in module-level monitoring
CommissioningPre-commissioning validation plus SetApp
Compliance and warranty
Grid connection standardsSee the certification documents attached to this listing
Warranty12 years standard, extendable to 20 years
Specification sourceData Sheet SE Synergy Manager
Frequently asked questions

Questions we get asked about this inverter

What actually arrives on site?

A Synergy Manager and either two or three Synergy Units, depending on the power class. They assemble on the wall into one inverter. Secondary units are also available separately as spares or for expansion.

Why does modularity matter?

Handling and uptime. A 100 kW monolithic inverter needs mechanical lifting; Synergy Units do not. And when one unit faults, the rest keep generating.

What is pre-commissioning?

An automated check of wiring and system configuration performed during installation, before the grid connection is live. It catches wiring faults while the installers are still on site rather than on commissioning day.

Do I need optimisers?

Yes, on every module.

What warranty?

12 years standard, extendable to 20.

ClearRay Solar

Documents, advice and trade pricing

Every datasheet, certificate, installation manual and warranty document we hold for this product is in the Documents tab below. See the rest of our inverter range and our solar panels, or email our sales team at sales@clearraysolar.com if you would like us to check a string design or a compatibility question before you order.

Build your complete solar system

Everything you need in one place.

  • Inverters
  • Batteries
  • Mounting Systems
  • Cabling & Accessories
  • Protection Devices
Build a system