• MCS-certified products
  • Next Day Delivery
Enphase 50 IN STOCKReady for immediate dispatch

Enphase Q Cable Sealing Caps (pack of 10)

EN-Q-SEAL-10
£19.33 ex VAT £23.20 inc VAT

How many inverters do you need?

Secure Checkout 14-Day Returns Tracked Delivery
High Conversion EfficiencyMore of your solar reaches the home
MPPT TrackingMaximises yield in changing light
Grid CompliantMeets UK G98 / G99 requirements

Enphase Q Cable Sealing Caps (pack of 10)

Enphase · trade pack

Enphase Q Cable Sealing Caps (pack of 10)

A trade pack of 10 units.

This listing supplies 10 of the same part in one order, priced for installers and specifiers buying at volume. The individual product page carries the full specification, datasheets and certification.

Important

Please read before ordering

This is a bulk pack of 10 x Enphase Q Cable Sealing Caps (1 Item) (EN-Q-SEAL)
Overview

About this pack

This listing supplies 10 of the same part in one order, priced for installers and specifiers buying at volume. The individual product page carries the full specification, datasheets and certification.

Details

What this is

ManufacturerEnphase
Part numberEN-Q-SEAL-10
Quantity in this pack10
Goes with this

Ordered alongside this item

ClearRay Solar

Documents, advice and trade pricing

Any datasheets we hold are in the Documents tab below. See the rest of our inverter range, or email sales@clearraysolar.com if you need help.

Have questions?

Three figures govern it, all in the Technical Specifications: the MPPT voltage range, the maximum input voltage and the maximum DC power. Tell us which panel you're pairing it with and we'll confirm the string layout.

G98 covers installations up to 3.68kW per phase and is notified to your DNO after commissioning. Anything larger needs G99 approval agreed beforehand. We can flag which one your design falls under.

A hybrid inverter takes a DC-coupled battery directly. A standard string inverter needs an AC-coupled battery alongside it. The Technical Specifications show which type this unit is.

Yes, up to the maximum DC power figure in the specifications. Modest oversizing is normal practice - it lifts output in winter and at either end of the day, at the cost of brief clipping at midday peak.

An MPPT tracks the optimum operating point for a string of panels. You want one per roof orientation or pitch, because panels facing different directions on a single tracker drag each other down.

The standard manufacturer warranty is listed under the Warranty tab. Extended cover is available on most brands - see Warranty Extensions.

Build your complete solar system

Everything you need in one place.

  • Inverters
  • Batteries
  • Mounting Systems
  • Cabling & Accessories
  • Protection Devices
Build a system
Shipping & Returns

Delivery times vary by region:

  • UK — 1-2 business days
  • Highlands & Islands — 1-2 business days

Returns accepted within 14 days of delivery for unused items in original packaging.