• MCS-certified products
  • Next Day Delivery
SolarEdge 32 IN STOCKReady for immediate dispatch

SESUK-RWR0INNN8 Synergy Secondary Unit with RapidShutdownDevice

SESUK-RWR0INNN8
£935.95 ex VAT £1,123.14 inc VAT

How many inverters do you need?

Secure Checkout 14-Day Returns Tracked Delivery
High Conversion EfficiencyMore of your solar reaches the home
MPPT TrackingMaximises yield in changing light
Grid CompliantMeets UK G98 / G99 requirements
Technical Specifications
Module Efficiency98 %
Battery Voltage0 V
MPPT Quantity0.0
Min MPPT Voltage0 V
Max MPPT Voltage0 V
Max Input Voltage1,000 V
Max DC Power67,500 W
Max AC Power (5 min)49,990 W
Surge AC Power (1 sec)49,990 W
Max DC Current74 A
Max DC Inputs6.0
Integrated DC SwitchYes
View Full Datasheet

SolarEdge SESUK-RWR0INNN8 Synergy Secondary Unit with RapidShutdownDevice

SESUK-RWR0INNN8 Synergy Secondary Unit with RapidShutdownDevice
Part No: SESUK-RWR0INNN8
PV Inverters - Main Units
  • Phases: 3

Three Phase Inverter - Solar Edge Synergy Unit with Rapid Shut Down

  • Dimensions (H x W x D): 558 x 328 x 273mm
  • Weight: 32kg
  • Unit for Three phase inverter with Synergy technology with Automatic Rapid Shutdown upon AC grid disconnect.
Warning: Solar Edge Synergy Unit can not be used on its own, it always requires a Synergy Manager to work.
High Efficiency 98 %More power from the same roof space
Have questions?

Three figures govern it, all in the Technical Specifications: the MPPT voltage range, the maximum input voltage and the maximum DC power. Tell us which panel you're pairing it with and we'll confirm the string layout.

G98 covers installations up to 3.68kW per phase and is notified to your DNO after commissioning. Anything larger needs G99 approval agreed beforehand. We can flag which one your design falls under.

A hybrid inverter takes a DC-coupled battery directly. A standard string inverter needs an AC-coupled battery alongside it. The Technical Specifications show which type this unit is.

Yes, up to the maximum DC power figure in the specifications. Modest oversizing is normal practice - it lifts output in winter and at either end of the day, at the cost of brief clipping at midday peak.

An MPPT tracks the optimum operating point for a string of panels. You want one per roof orientation or pitch, because panels facing different directions on a single tracker drag each other down.

The standard manufacturer warranty is listed under the Warranty tab. Extended cover is available on most brands - see Warranty Extensions.

Build your complete solar system

Everything you need in one place.

  • Inverters
  • Batteries
  • Mounting Systems
  • Cabling & Accessories
  • Protection Devices
Build a system